65' Rapid Span w/ Concrete Deck for John Hancock @
Lower Lund Mainline
(Summer 2011) |
|

Placing Shop Built 80ft Steel Beams
3290 Road over Upper Wishkah River |
|
|
|

3290 Bridge Rayonier Timber Co. |
|

80ft Steel Beam / Timber deck bridge over Upper
Wishkah River for Rayonier |
|
|
|

CAT 345C & CAT 330C
Excavating for footings @ Stewart "Walker Cr. bridge site" |
|

Placing 60' BIG R bridge @ Stewart "Walker Cr." |
|
|
|

36' Voided Slab for Grays Harbor Conservation District
Tributary to Wishkah River |
|

Finished Deck - 36' Voided Slab |
|
|
|